Currently you need to plan all the hours as configured in the workload schedule in order to get the green checkmark in the overview, which leaves no time for "unplanned" work (or you must ignore the visibility of this checkmark).
When there is a possibility to set a minimum required planned time (as a part of the workload schedule) you would be able to handle time for unplanned work and still got the green checkmark visual control.
In practice : workload schedule is set to 8h per day (because that is the time that needs be logged per day) , but I only want to plan 6h per day, and still get the green checkmark.