Project in Tempo are created as monetary-based or time-based, but the project list filter does not support this project type as a criteria. I have to use tags to be able to filer them by the type. Even though this information is already associated with the project. Also a visual differentiation of the two types would be useful in the project list. Sometimes I need both views, so I create both types of reports for a project. I have to separate them by name e.g. "Project X [time-based]"