Save Cost Tracker Filter (instead of selecting it every time)
About 99% of the time, I only want to see "In Progress" Cost Tracker Projects, but the default is our very long list of all projects. Each time I load the Cost Tracker, the first thing I need to do is select Filer > Status > In Progress. Can...