In the planned time report, users that do not have any planned time in the selected period, are not shown at all.
This users should also be shown. If not, the report shows incomplete and wrong data. E.g. the sum of required hours and required % is wrong.
Tempo Platform | On-Premise |
Tempo Products | Tempo Planner |